Abbott is a leading global medical devices and healthcare company focused on improving lives through the development of innovative health technologies and products. Founded in Chicago, the company specialises in diagnostics, medical devices, nutrition, and wearable health solutions, helping individuals monitor their health and make informed healthcare decisions. Operating in more than 160 countries and supported by an extensive global supply network, Abbott is committed to advancing healthcare through cutting-edge research, innovation, and the delivery of high-quality products that improve patient outcomes worldwide.
iab-Lab was appointed by Abbott to deliver a £4.1 million design and build project, transforming a large warehouse facility into a specialist laboratory, office and warehouse environment. The nine-month project included the construction of a new mezzanine floor providing open-plan offices, management offices and meeting rooms, with laboratory accommodation located on the ground floor below. An existing ground and first-floor office area at the front of the building was also comprehensively refurbished to meet Abbott’s requirements. The works included the construction of 9-metre-high blockwork and jumbo stud walls, together with a steel-framed and fireproofed mezzanine structure.
The project incorporated extensive specialist laboratory infrastructure and building services. iab-Lab designed and installed a comprehensive HVAC system for both laboratory and office areas, alongside full mechanical and electrical services, access control, intruder and fire alarm systems and external CCTV. Specialist laboratory facilities included laboratory furniture, recirculating filtered fume cupboards, walk-in refrigerators and freezers, a nitrogen generation plant with cylinder backup, distribution pipework and drop-point regulators, clean compressed air supplied via nitrogen generation equipment, and a bottled helium supply with associated distribution pipework. A Triple Red specialist water treatment system and distribution network was also installed, alongside comprehensive plant and equipment supported by internal and external galvanised steel gantries and external concrete plant bases.
The project also required significant external and infrastructure works, including an upgrade to the incoming electrical power supply to accommodate the increased demand from the new facility. iab-Lab managed and submitted the full planning application on behalf of Abbott, providing a complete design and build service from initial planning through to completion. The project was delivered to a demanding programme of nine months and completed on time and within budget, demonstrating iab-Lab’s ability to coordinate complex laboratory, office and specialist engineering requirements within a single integrated project.