Get to know our client

Carbogen is a leading Contract Development and Manufacturing Organisation (CDMO) providing integrated solutions for the development and manufacture of pharmaceutical and biopharmaceutical products. Working closely with clients throughout the drug development lifecycle, Carbogen supports the successful development, scale-up, manufacturing, and commercial launch of innovative medicines. With extensive scientific expertise and advanced manufacturing capabilities, the company plays a key role in helping bring new therapies to market efficiently and safely.

Main Scope of Works

  • Strip out and disposal of existing ceilings and floors

  • New laboratory and office specification ceiling grids and tiles

  • New perforated ceiling tiles to 2nd floor laboratory for air flow requirements

  • New fume extraction fans and stacks to the roof level, and two AHU’s 

  • Installation of new HVAC systems to new laboratories and offices, including all plant and equipment

  • All associated extract systems to laboratories, as well as the reconfiguration and upgrade of the existing extraction system and cabinets

  • Water and drainage pipework, including installation of Category 5 break tank for all lab water

  • New special gas pipework and gas detection system

  • New fire suppression systems to new and existing Kilo lab fume cupboards

  • VAV system to 1st and 2nd floor new and existing fume cupboards

  • Fire alarm system, new lighting, emergency lighting and emergency exit signs to all new areas

  • New furniture to new laboratories and write up areas

  • Installation of roller storage to basement room

  • Full structural assessment of the loading capacity of the roof 

  • Full planning permission application

iab-Lab was appointed to deliver a full refurbishment and upgrade of an existing laboratory and office facility, involving extensive internal reconfiguration, M&E installation, and compliance-focused enhancements. The project included the complete strip-out of existing flooring, partitions, and ceilings, followed by the installation of high-specification finishes tailored to both laboratory and office environments. This included vinyl flooring to all lab spaces, specialist Gerflor tiles to the new and existing Kilo labs, and carpet tiles to all office areas.

New partition walls, doors, windows, and ceiling grids were installed throughout, with perforated ceiling tiles used in specific lab areas to support airflow requirements. A key feature of the project was the installation of new fume extraction systems, including roof-mounted extraction fans, two AHUs (one on the roof and one on a gantry above the basement), and a full VAV system for fume cupboards across the 1st and 2nd floors. Existing extraction infrastructure and cabinets were reconfigured and upgraded to meet new performance standards.

Mechanical and electrical works included the installation of all new HVAC systems and associated plant, as well as Category 5 water systems, drainage, and new special gas pipework with integrated detection systems. Fire suppression systems were also installed in both new and existing Kilo lab fume cupboards. Lighting, emergency lighting, fire alarms, and exit signage were all updated in line with the new layouts and regulatory requirements.

Additional works included a structural assessment of the roof to confirm its capacity to support new plant equipment, repairs to the roof weather proofing, as well as the installation of new lab furniture, write-up areas, and roller storage units in the basement. This project highlights iab-Lab Construction’s capability to manage complex, multi-discipline lab environments to the highest standard.