Completed September 2015
Contract Value £2,500,000
Conway, North Wales
Get to know our client
CGG is a leading global geoscience company providing advanced geological solutions and expertise to the energy sector. By combining specialist geological services, high-quality datasets, and industry-leading technical knowledge, CGG helps clients address complex challenges across exploration, development, and production activities. The company plays a key role in improving hydrocarbon recovery and operational efficiency, while also supporting the energy transition through services related to carbon capture and storage, decommissioning, and risk management.
Main Scope of Works
Structural design and installation of internal mezzanine floor, staircase and external plant deck and gantry
External drainage to supply new underground and above ground settlement tanks
24 hour automatic standby generator
New mains incoming power cabling and mains gas pipework
Duplex Run and Standby medical air external compressor and distribution pipework
External compressor housing
External Bottle Store, Run and Standby Gas Manifolds, Distribution Pipework for Hydrogen, Nitrogen, Oxygen, Helium and Liquid CO2.
Installation of new internal ground and 1st floor walls, ceilings and floors to form a series of laboratories, plant rooms and offices
Formation of openings in the external walls and installation of new windows
All associated internal and external mechanical and electrical services, including HVAC and special gases
Trend BMS controls
Standard Fume Cupboards and 2000mm wide Recirculating Water Wash Fume Cupboards with Linked Extraction Systems.
Bespoke Fume Hoods and Individual movable Alsident Hoods.
Manual and Automatic Waste Tank Discharge Systems to Beckart Treatment Plant
All new laboratory furniture, change room facilities and warehouse racking
iab-Lab was appointed to deliver the £2.6 million design and build project, converting an existing 1,440m² office and warehouse building into a 2,300m² specialist facility comprising laboratories, offices, plant rooms and warehouse space.
The ground floor was developed to provide extensive warehouse accommodation for samples and site equipment, an engineer’s workshop and a dedicated bunded plant room for a specialist wastewater treatment system. Two dedicated internal plant rooms were also created to accommodate boosted mains and tank cold water systems, boilers serving both tank and mains water, and TREND BMS controls. A separate electrical plant room was provided for the new mains incoming supply, generator cabling, automatic changeover panel and main distribution board.
A purpose-built mezzanine floor was constructed to accommodate a series of specialist laboratories. These spaces were fitted with laboratory benching, fume cupboards, canopy and cone fume hoods, dedicated fume extraction systems, replacement air supplies and close-control recirculating air conditioning. The floor also incorporated male and female laboratory changing rooms, a laundry area, cleaner’s store, emergency equipment store and dedicated acid and solvent storage. A large sample preparation laboratory was designed to accommodate eight 2,000mm recirculating water-wash fume cupboards, supported by a bespoke air supply system providing temperature control and significant replacement air volumes. Access to the external plant gantry was provided at the east elevation, supporting 13 individual fume extraction fans, while a platform lift at the rear of the building provided passenger and sample access alongside a dedicated internal fire escape.
Extensive external and mechanical and electrical works were undertaken, including new equipment zones, plant gantry, HVAC plant, power, gas and water supplies, additional laboratory drainage, three-stage settlement tanks and a 24-hour standby generator. A clean-air duplex compressor system was installed to provide run and standby capacity, housed externally within a dedicated ventilated, heated, weatherproof and soundproofed enclosure. Specialist gas services were installed to support the GC laboratory, providing oxygen, helium and liquid CO₂, with hydrogen and nitrogen generated through under-bench generators. Energy-efficient VRF air conditioning and LED lighting, including self-testing emergency lighting, were installed throughout the laboratories.