Get to know our client

CPS is a UK-wide histopathology services provider, operating extensively within the independent healthcare sector. The company delivers high-quality diagnostic support to healthcare clients, combining clinical expertise with a strong commitment to service excellence. CPS is also actively involved in technology-driven research, including pioneering advances in tissue processing techniques and digital pathology to improve diagnostic accuracy and efficiency. With a focus on innovation and sustainability, the organisation also strives to operate in a paperless environment wherever possible.

Main Scope of Works

  • Full strip-out of existing finishes, including flooring, ceilings, and internal partitions

  • Removal of existing mechanical, HVAC, lighting, and small power services, with life safety and security systems retained for adaptation

  • Formation of a new section of mezzanine and fire protection to mezzanine soffits and structural elements

  • New plasterboard linings to perimeter walls

  • Construction of new internal partitions to suit the revised layout

  • Vinyl flooring throughout, with carpet tiles to office areas

  • Suspended ceilings installed across all areas

  • Decorations throughout all areas

  • Heating, Ventilation and Air Conditioning (HVAC) system

  • Water and drainage pipework, including installation of category 5 break tank for all laboratory water and a new boiler

  • Electrical services including small power, data, lighting, and emergency lighting

  • Adaptation of existing security systems such as fire alarm, access control, CCTV, and intruder alarm systems

  • Internal fit out of fixed furniture, roller storage, and specialist equipment

  • Installation of a dumbwaiter

  • Down-draught benches with integrated recirculating filtration systems

  • Localised roof repairs where required

  • Builder’s works associated with all mechanical requirements

  • Fire stopping to all areas required

We were proud to partner with our long-standing client CPS to deliver the comprehensive strip-out and fit-out of their new facility. From initial appointment through to completion, the project transformed the ground and first floors into a high-specification environment tailored to the client’s evolving needs.

The scheme delivered a suite of specialist laboratories, contemporary office spaces, and associated support facilities, including plant rooms, prayer rooms, and welfare areas, all carefully designed to enhance both functionality and efficiency. Working in close collaboration with CPS, we ensured that every aspect of the design and build aligned with their operational and technical requirements, resulting in a high quality, future-proofed workplace.