Get to know our client

Founded over 530 years ago, Ermysted’s Grammar School is one of England’s oldest schools and has a long-standing reputation for providing an outstanding education to boys from Skipton and the surrounding areas. Alongside academic excellence, the school places a strong emphasis on developing character, resilience, and self-confidence, fostering a supportive and inclusive environment where every pupil is encouraged to achieve their full potential. Through a wide range of academic, sporting, creative, and extracurricular opportunities, Ermysted’s continues to nurture well-rounded individuals equipped for success both in education and later life.

Main Scope of Works Phase 1 and 2

  • Design & Specification

  • Solid Timber Laboratory Furniture

  • Solid Timber Iroko Work Surfaces

  • Electrical and Ventilation Services

  • Delivered in the Holiday Period Between Term Time.

iab-Lab undertook the refurbishment of a series of existing Physics and Chemistry labs for Ermysted School. The laboratory furniture was designed and constructed to provide a solid timber and veneer finish to new lab benches with a partial refurbishment of the school’s existing furniture. We completed the full refurbishment of the laboratory furniture including strip out, all fixtures, fittings, mechanical, electrical and ventilation services. The work was completed within a 6 week period during the summer holidays.

Main Scope of Works Phase 3

  • Teaching Laboratory

  • Traditional timber furniture with solid iroko work surfaces

  • Forward facing student benches

  • Elevated teachers bench with dais

  • Preparation Room

  • Fume cupboard and extract system

  • Above floor mechanical services and Vulcathene Drainage

Following the successful completion of earlier refurbishment phases, iab-Lab was invited back to support the next stage of the school’s laboratory development programme in 2013, demonstrating the long-term relationships and continued support we provide to our clients.

Working closely with the school and local contractors, Tiffany Construction, iab-Lab designed and installed laboratory furniture for a new teaching laboratory extension. In keeping with the previously refurbished Chemistry and Physics laboratories and the Central Preparation Room, the new laboratory spaces were designed to maintain the same durable, traditional style specified by the school.

The project was completed on time and within budget, incorporating modern teaching requirements while maintaining consistency across the wider science department facilities.