Evox Therapeutics is a biotechnology company focused on transforming the treatment of severe neurodegenerative diseases through advanced genetic medicine and next-generation genome editing technologies. The company is developing an innovative pipeline targeting conditions such as Huntington’s disease, ALS, and Spinocerebellar Ataxia Type 2 (SCA2), while exploring broader applications across both genetic and non-genetic central nervous system disorders. By leveraging its proprietary exosome-based delivery platform and gene editing technologies, Evox aims to expand the reach of genetic medicine into the brain, enabling safer, more effective, and commercially scalable treatments for patients with complex neurological conditions.

Main Scope of Works

  • Refurbishment of a 5000 sq ft open plan unit into laboratories and offices

  • Installation of a new pump assisted drainage system

  • Modification and upgrade of HVAC plant and equipment to meet laboratory standards

  • Installation of new special gas plant and equipment

  • Associated Mechanical and Electrical installations including door access

  • Installation of cantilevered furniture system with mobile under bench storage

  •  Compliance with all license to alter requirements

Evox Therapeutics appointed iab-Lab to design and build a new Biotherapeutics Research and Development (R&D) laboratory following their successful occupation of a smaller laboratory previously fitted out by iab-Lab. The project began with an outline design and budget to support Evox in securing investment and management approval.  Located on the third floor of the Medawar 2 Magdalen Centre, the project was delivered as a turnkey fit-out within an exceptionally tight 14-week programme.

The existing laboratory base build provided a strong starting point, allowing iab-Lab to retain and adapt existing carpet tiles, lighting and HVAC systems to suit the new layout. The existing kitchen and toilets were also refreshed and retained, while the HVAC system was extended and reconfigured rather than replaced, reducing costs and disruption. A new BMS controls system was installed to manage the HVAC and provide reporting, while an existing Category 5 backflow prevention break tank was retained as part of the base build.

The third-floor location presented logistical challenges, particularly the transportation of materials, with plasterboard having to be cut down to pass through the existing access routes. To maintain a high-quality finish, all walls were fully plastered. Specialist laboratory services included a dedicated CO₂ distribution system using degreased copper pipework, a 2 x 2 automatic changeover manifold and low-level alarm system to maintain supply, together with oxygen depletion monitoring throughout laboratories containing CO₂ outlets. The completed facility provided Evox with a flexible, high-quality R&D environment designed to support both current operations and future growth.