Kirklees College Laboratory - Waterfront and PMC

Main Scope of Works

  • Refurbishment of existing rooms into two new college laboratories

  • Installation of new pumped drainage system

  • All associated Mechanical and Electrical service installations

  • Installation of Flamefast Gas Detection and Shutoff system

  • Installation of WRAS compliant water system, including a CAT5 break tank

  • Addition of mobile recirculating educational fume cupboard

iab were successfully awarded this contract by Kirklees College to complete the simultaneous refurbishment of areas in both their PMC and Waterfront facilities. Time scale was key for the client. Both the design and construction phases of the project needed to be completed within 8 weeks to ensure the laboratories were ready for the start of the new academic year.

New flooring and decoration were installed throughout and a combination of plinth-mounted and free-standing table leg frame systems were designed to match the existing client furniture.

Student safety was a key aspect for the client, with the refurbishment focusing on upgrading existing safety systems alongside the installation of Flamefast Gas Detection Shutoff systems.