Laboratory Fit-Out Costs: Key Considerations for Planning a Realistic Budget

September 2026

Planning a new laboratory or considering the refurbishment of an existing facility? One of the first questions most organisations ask is: how much will it cost?

There is no single price for a laboratory fit-out or refurbishment. Every project has different requirements, from the size and condition of the existing building, to the type of laboratory, specialist equipment, mechanical and electrical services and level of specification required. 

However, it is important to understand the factors that influence laboratory fit-out and laboratory refurbishment costs at an early stage, as this can help you establish a realistic budget, make informed decisions and reduce the risk of unexpected costs later in the project. 

Below we discuss certain questions to ask yourself, and areas to consider. 

Key Factors Impacting Laboratory Fit-Out Costs

1. New laboratory or refurbishment?

One of the first decisions is whether to refurbish an existing facility or create a completely new laboratory. 

A refurbishment can initially appear to be the more economical option because the building structure and some existing services are already in place. However, this does not necessarily mean that refurbishment will always be cheaper. 

Existing electrical supplies, ventilation, HVAC, water and drainage, specialist gases or structural arrangements may not be suitable for the proposed laboratory. Significant upgrades may therefore be required before the new facility can operate as intended. 

A new-build laboratory generally provides greater flexibility because the building, plant rooms, services and specialist requirements can be considered from the outset. 

For refurbishment projects, a detailed survey of the existing building is particularly important. Understanding what can be retained, upgraded or needs replacing can make a significant difference to overall lab refurbishment costs. 

The right approach will depend on the condition of the existing facility, the proposed use of the laboratory and the long-term requirements of the organisation. 

2. The purpose of the laboratory

The intended use of the laboratory is one of the biggest factors affecting the specification and therefore the cost. 

A basic teaching laboratory will have very different requirements from a highly specialised research, pharmaceutical, analytical or quality control facility. 

Before developing a budget, it is important to establish: 

  • What work will be carried out in the laboratory?
  • What equipment will be required?
  • What chemicals or substances will be handled?
  • What level of ventilation and containment is required?
  • What specialist gases are needed?
  • What temperature or environmental conditions are required?
  • Will the laboratory need to accommodate future expansion?

Establishing these requirements early allows the design team to develop the building and services around the actual needs of the lab, rather than adding specialist requirements later in the project. 

3. The building and existing infrastructure

For refurbishment projects, the condition and capacity of the existing building can have a significant effect on the budget. 

Areas that may need to be assessed include: 

  • Existing electrical supplies
  • Ventilation and extraction
  • Heating and cooling systems 
  • Water and drainage 
  • Specialist gas services 
  • Lighting
  • Fire protection 
  • Structural loading 
  • Existing ceilings, floors and partitions 
  • Available plant and roof space

 

For example, larger laboratory equipment may require additional structural support, while new fume cupboards may require new extraction routes and roof-level discharge systems. 

Existing infrastructure can sometimes be retained and incorporated into a new laboratory design. However, it should be assessed carefully rather than assuming that existing services are suitable simply because they are already installed. 

4. Mechanical and electrical services 

Mechanical and electrical services are often one of the largest elements of a laboratory project. Laboratories typically require considerably more building services than conventional office or commercial environments. 

Ventilation, HVAC and air replacement

Laboratories can require carefully controlled heating, cooling and ventilation systems. Where fume cupboards or other extract systems are installed, additional air replacement may be required. 

Room conditions, temperature controls, and general operating requirements can all influence the cost of the HVAC system. 

Air replacements, heating and cooling should be considered together during the design process. An effective ventilation system needs to provide the required air supply while maintaining suitable environmental conditions within the laboratory. 

Electrical services 

Laboratory equipment can require substantial electrical capacity, with some specialist equipment requiring dedicated supplies. A laboratory electrical installation may include:

  • General power
  • Specialist electrical supplies
  • Lighting 
  • Emergency lighting 
  • Data and communications
  • Access control
  • Equipment connections

 

The electrical infrastructure should be designed alongside the laboratory layout and equipment schedule to ensure that power is available where it is required. 

Water and drainage

Laboratory sinks, specialist equipment and processes may require new water supplies and drainage systems. The location and number of sinks, equipment drainage requirements and existing building infrastructure can all influence the design and cost of the installation. 

Specialist Gases 

Some laboratories require gases such as nitrogen, oxygen, carbon dioxide, argon or other specialist gases. 

Costs may include the internal distribution system as well as external bottle stores, generators regulators, detection systems, and associated safety measures. The number and type of gases required can therefore have a significant effect on the overall project budget. 

5. Laboratory furniture 

Laboratory furniture is another important part of the overall budget. 

The specification can range from standard floor-mounted furniture to bespoke installations designed around specialist equipment and processes. Typical requirements may include:

  • Base units 
  • Wall cupboards
  • Tall storage units 
  • Mobile units
  • Cantilever benches
  • Peninsula and island benches 
  • Specialist instrument benches
  • Sinks and drainage
  • Laboratory seating 
  • Shelving 

6. Worktop selection

Different laboratory environments may require worktop materials such as Trespa, Corian, Iroko, or stainless steel, depending on the intended application. 

The correct material should be selected according to the laboratory’s activities, including the chemical used, potential spillages, temperature requirements, cleaning regimes, and expected level of wear. 

Choosing an unnecessarily high-specification material can increase lab costs, while selecting a material that is unsuitable for the intended application can lead to additional maintenance or replacement costs later. 

7. Specialist Equipment

Specialist equipment can have a significant effect on the overall project cost and should be considered as early as possible. Depending on the laboratory, this may include:

  • Fume cupboards
  • Biological safety cabinets
  • Autoclaves
  • Cold rooms 
  • Laboratory refrigerators and freezers
  • Specialist extraction systems 
  • Centrifuges 
  • Specialist process equipment 

 

Equipment requirements can also influence the building and its services. Larger equipment may require additional structural support, dedicated electrical supplies, specialist ventilation, cooling water, drainage or extraction. 

Fume cupboards and extraction

For laboratories using hazardous, volatile or harmful substances, fume cupboards and extraction systems can be an essential part of the design. The cost of an extraction system can depend on: 

  • Number of fume cupboards
  • Type and size of cupboards
  • Required airflow
  • Extraction routes 
  • Fan requirements 
  • Discharge arrangements 
  • Air replacement requirements 
  • Noise considerations 
  • Energy efficiency 
  • Control systems

 

The location of the laboratory within a building can also affect the cost. Long duct runs, restricted roof access, or limited plant space can all add complexity to the installation. 

This is why fume cupboards, extraction and air replacement should be considered during the early design stages rather than treated as additions later in the project. 

8. Design, surveys and specification

Good design and coordination can have a significant impact on the final cost of a laboratory project. Depending on the project, the design process may include: 

  • Initial requirements or URS development
  • Building surveys
  • Laboratory layouts
  • Architectural design
  • Mechanical services design
  • Electrical services design
  • HVAC design
  • Extraction design
  • Specialist gas design
  • Equipment coordination
  • Furniture design
  • 3D modelling
  • Compliance and statutory requirements
  • Construction drawings and specifications

 

Developing the design before construction allows potential problems and clashes to be identified earlier, when they are generally easier and less expensive to resolve. It also provides a more accurate basis for cost planning and allows the client to understand what is included within the proposed laboratory fit-out. 

Other Potential Costs to Consider

The major laboratory systems are not the only factors that need to be considered when preparing a budget. Depending on the project, additional costs may include: 

  1. Strip-out and demolition
  2. Disposal of existing furniture and equipment 
  3. New partitions and ceilings 
  4. Flooring and finishes 
  5. Building and structural works 
  6. Fire and life-safety systems 
  7. Data and access control 
  8. Site logistics 
  9. Temporary facilities 
  10. Protection of existing equipment 
  11. Working around an occupied laboratory 
  12. Restricted site access or delivery arrangements 

 

These factors can be particularly important during refurbishment projects. 

For example, working within an operational laboratory may require phased works, temporary facilities or out-of-hours working to minimise disruption. 

 

How Long Does a Laboratory Refurbishment Take?

The programme depends on the size and complexity of the project. 

A relatively small laboratory refurbishment may be completed within a few months, while a larger facility involving significant mechanical and electrical works, specialist extraction, gases and equipment can take considerably longer. 

A typical project may include: 

Initial consultation and requirements 

Survey and assessment 

Design and specification 

Cost planning

Construction and fit-out

Testing, commissioning and handover 

 

Allowing sufficient time for design and coordination before construction begins can help reduce delays and costly changes during the fit-out. Longer, more heavily phased projects also have direct cost implications as they extend the time needed for site facilities, professional fees and contingency planning. 

 

How Can You Control Laboratory Fit-Out Costs?

There are several ways to help keep a laboratory project within budget. 

1. Start with a clear brief

A clear understanding of the laboratory’s intended use, equipment and future requirements makes it easier to design an appropriate facility and establish realistic laboratory fit-out costs. 

2. Survey the existing building 

For refurbishment projects, understanding the condition and capacity of the existing infrastructure can help identify potential costs before work begins. 

3. Develop the design before construction 

Investing time in design and coordination can help identify clashes and potential problems before they become expensive changes on site. 

4. Prioritise your requirements 

Separate essential requirements from features that would be beneficial but aren’t critical to the operation of the laboratory. 

5. Consider future requirements 

A laboratory may need to expand or change over time. Allowing for future services, equipment or additional capacity during the initial project can sometimes be considerably more economical than carrying out major modifications later. 

6. Choose materials based on their application

Higher-cost materials aren’t necessarily better for every laboratory. Worktops, flooring and furniture should be selected according to the actual conditions they will be exposed to. 

7. Coordinate equipment and services early 

Knowing where major equipment will be located allows mechanical, electrical, gas, drainage and ventilation requirements to be incorporated into the design rather than added later. 

8. Allow for contingency 

Particularly on refurbishment projects, it is sensible to allow an appropriate contingency within the budget. Existing building can contain unforeseen conditions, such as undocumented services, deteriorated infrastructure or structural limitations, which may only become apparent once work begins. 

 

In Summary…What Should Your Laboratory Refurbishment Budget Include? 

When preparing an initial budget, it is worth considering the project as a complete system rather than simply budgeting for laboratory furniture. 

Your budget may need to include: 

  • Surveys and design 
  • Strip-out and demolition 
  • Building and structural works 
  • Partitions, ceilings and flooring 
  • Laboratory furniture and worktops 
  • Fume cupboards 
  • Extraction and ventiliation
  • HVAC and air replacement 
  • Electrical services and lighting 
  • Plumbing and drainage
  • Specialist gases 
  • Fire and life-safety systems 
  • Data and access control 
  • Specialist equipment 
  • Testing and commissioning 
  • Project management 
  • Contingency 

 

Considering all of these elements at the outset provides a much more realistic picture of your overall laboratory refurbishment costs and helps avoid significant elements being missed from the initial budget. 

Every laboratory project is different, so there is no reliable ‘cost per square metre’ that can be applied to every refurbishment or fit-out. 

The most accurate budget comes from understanding the intended use of the facility, assessing the existing building and developing the design and specification around the laboratory’s actual requirements. 

 

Plan Your Laboratory Fit-Out or Refurbishment with iab-Lab

At iab-Lab, we work with clients to develop laboratory environments from initial consultation and design through to installation, commissioning and handover. Our experience covers laboratory refurbishment, new laboratory fit-outs, specialist furniture, mechanical and electrical services, fume cupboards, extraction systems, and specialist laboratory installations. 

Early involvement from an experienced lab design and fit-out specialist can help you identify potential costs, technical challenges, and opportunities to improve the final facility, well before a budget is fixed. 

Planning a laboratory refurbishment or new fit-out? Contact iab-Lab to discuss your requirements and develop a realistic project budget.