Get to know our client

Natural Resources Wales is a Welsh Government-sponsored body responsible for the protection, management, and sustainable use of Wales’ natural resources. As the principal environmental regulator, advisor, and largest land manager in Wales, the organisation plays a vital role in safeguarding the environment, regulating industry, and supporting the responsible management of natural resources. Through its work, Natural Resources Wales helps ensure that the country’s landscapes, ecosystems, and natural assets are protected and enhanced for both current and future generations.

Main Scope of Works

  • Full turnkey design from client-supplied URS documentation

  • Electrical, mechanical and architectural strip-out

  • Roof edge barrier protection and roof access hatches

  • Tower block roof weatherproofing

  • Internal and external builders’ works, including concrete plant bases

  • New partitions, ceilings and flooring

  • Design, installation and commissioning of electrical services, including power, data, lighting, specialist supplies and access control

  • Design, installation and commissioning of water and drainage services

  • Design, installation and commissioning of HVAC systems

  • Design, installation and commissioning of fume cupboards, LEV extraction, fume hoods and associated extract systems

  • Installation of laboratory furniture

  • External liquid nitrogen plant and associated pipework within a secure enclosure

  • Design, installation and commissioning of special gases and gas detection systems

  • Supply and installation of a new cold room

iab-Lab were appointed as Principal Designer and Principal Contractor for the full turnkey fit-out of Natural Resources Wales’ new laboratory facilities at Swansea University Campus.

The project involved developing the client’s initial URS into a fully developed Stage 3–4 design, ensuring compliance with all relevant regulatory and statutory requirements. Following completion of the design, iab-Lab proceeded as Principal Contractor, delivering the full laboratory fit-out and associated building services works.

The laboratories were located within a tower block on the university campus, with new plant and equipment installed on the building’s roof. As part of the works, iab-Lab completed roof weatherproofing, installed new roof edge protection and provided safe roof access facilities to support the new installations.

A new external BOC nitrogen generator was also installed within a secure enclosure in the adjacent car park, with the installation designed to ensure all required safety distances and regulations were met.

The project included the installation and commissioning of new electrical, mechanical, HVAC, water and drainage services, specialist laboratory systems, fume cupboards and LEV extraction, special gases, laboratory furniture and associated infrastructure.

We are proud to have worked closely with both Natural Resources Wales and Swansea University throughout the project, ensuring the completed facilities met the client’s requirements while also complying with the university’s standards and regulations. Collaborative working with all project stakeholders is essential to the successful delivery of every project, and is something iab-Lab prides itself on across all of our projects.