• Full Design and Build, converting an industrial warehouse to Offices and Laboratories

  • New Mezzanine to half of the warehouse with a double height atrium

  • New Cladding to the main front Façade with new glazed curtain walling

  • Installation of 3-way fast action roller shutter airlock between labs and warehouse

  • Full controlled HVAC and Fume Cupboard systems

  • Installation of new special gas plant and equipment including N2 and CA generators

  • Electrical loading calculations power supply requirements

  • Associated Mechanical & Electrical installations including Fire Alarm and Door Access

Leave Your Comment

© iab Lab 2022 | Registered in England: No. 2513825 | VAT Registered 606 976 705