Get to know our client

Relation Therapeutics is an innovative biotechnology company focused on discovering and developing transformational medicines for some of the world’s most challenging diseases. By combining high-resolution biological data, advanced machine learning, and clinical insights, the company is working to deepen the understanding of human biology and accelerate the development of more effective therapies. Through its end-to-end approach to drug discovery, Relation Therapeutics aims to unlock new treatment possibilities and improve outcomes for patients facing complex and debilitating conditions.

Main Scope of Works

  • Installation of solid and glass partition walls to form laboratories and meeting rooms

  • Modifications to the existing HVAC system and installation of new ventilation units to serve the laboratory areas as well as installation of emergency ventilation extract system for plant room

  • Reconfiguration of the existing lights and existing fire alarm system, both to suit the new layout

  • Installation of new laboratory furniture as well as floor coverings to all laboratory, office and corridor areas

  • Strengthening of the raised access floor, as required following structural engineer review, to allow for installation of new hydro box, water heaters, autoclave holding tank, and Sani flow pumps

  • Relocation of existing break tank from laboratory area to new plant room

  • Installation of special gas pipework and gas detection system

  • Installation of recirculating fume cupboards

  • Installation of door access control system to laboratory and plant room door

This project saw iab-Lab deliver a comprehensive laboratory and office fit-out on the 7th floor of a commercial building on Euston Road, London; a location that presented both logistical and structural challenges due to its elevation and restricted access. Our team successfully navigated these complexities, demonstrating our capability to deliver high-quality, specialist environments in demanding settings.

The works involved the full internal reconfiguration of the space, including the installation of solid and glazed partitioning to form bespoke laboratories and meeting rooms. We carried out significant modifications to the existing HVAC and ventilation systems, alongside tailored electrical and fire alarm adjustments to suit the new layout. The project also included the supply and installation of new laboratory furniture, flooring, and specialist systems such as recirculating fume cupboards, gas detection, and secure access control.

To support  the weight of the autoclave and safety cabinets, we strengthened the floor in line with structural engineer recommendations. Additionally, existing services such as the break tank were relocated to optimise functionality. Despite the complexities of working on an upper floor in a busy London location, the project was delivered efficiently, safely, and to the highest standards.