Replimune is a clinical-stage biotechnology company dedicated to transforming cancer treatment through the development of innovative oncolytic immunotherapies. Its pioneering therapies are designed to activate powerful and long-lasting anti-tumour immune responses, helping the body’s own immune system recognise and fight cancer more effectively. Since its founding in 2015, Replimune has been driven by a mission to change what a cancer diagnosis means for patients, with the ultimate goal of making cancer a curable disease through breakthrough advances in immunotherapy.

Main Scope of Works

  • Replacement of existing HVAC systems to suit the new layouts and laboratory requirements.

  • Strip-out and refurbishment of partitions, flooring, ceilings, lighting and electrical services.

  • New roof-space plant platforms within Units 69 and 71.

  • Modifications to water and drainage systems.

  • New small power, floor boxes, data and lighting installations.

  • Structural design and installation of a new steel link bridge between Units 70 and 71.

  • Relocation of existing fume extraction ductwork to accommodate the new link bridge.

  • New fixed laboratory furniture and internal finishes throughout.

  • New CO₂ pipework to laboratory equipment.

  • New door access control system.

  • Installation of a new lift within Unit 69.

  • New reinforced external concrete base and weatherproof storage unit.

  • Upgrade of the external store power supply to 3-phase.

iab-Lab was appointed to undertake the refurbishment and reconfiguration of multiple units to create improved laboratory and office facilities. The works included the complete replacement of the existing HVAC systems, strip-out of existing partitions, flooring, ceilings, lighting and electrical services, and installation of new finishes and services to suit the revised layouts. New laboratory furniture, CO₂ pipework, small power, data, lighting, water and drainage systems were also installed throughout the facility.

A key element of the project was the structural design and installation of a new steel link bridge between Units 70 and 71, requiring the relocation of existing fume extraction ductwork and the installation of new plant platforms within the roof spaces of Units 69 and 71. A new lift was also installed within Unit 69, alongside a new door access control system to improve connectivity, accessibility and security across the facilities.

External works included the construction of a reinforced concrete base and installation of a new weatherproof storage unit within the car park serving Units 69 and 70. The power supply to the external store was also upgraded to provide a new three-phase electrical connection. The project provided a fully refurbished and integrated laboratory and office environment, with specialist services and infrastructure tailored to the client’s operational requirements.