Completed March 2019
Contract Value £725,000
Redcar, North Yorkshire
Get to know our client
Ranked among the worlds largest petrochemical manufacturers, SABIC is a public company serving customers in more than 140 countries. Headquartered in Riyadh, Saudi Arabia, the company develops and manufactures innovative chemicals, polymers, agri-nutrients and high-performance materials that support industries including automotive, healthcare, packaging, electronics, construction and consumer goods.
Its global manufacturing footprint and extensive research and development capabilities make it a trusted leader in the chemicals industry.
Main Scope of Works
Strip out of existing laboratory M&E services, architectural infrastructure and all associated laboratory furniture.
Design and Installation of new HVAC services
Design and Installation of new special gas systems
Design and Installation of new water and drainage services
Infilling of existing floor service channels
Design and Installation of new small power, data and lighting
Design and installation of new Atex specific electrical installations
Installation of new flooring and ceilings
Design and installation of above ceiling service gantries
Design and installation of new fume cupboards and associated extraction systems
Consultancy and design meetings on site
Production of room by room architectural and M&E service requirement data sheets
Production of design and construction drawings for architectural furniture layout
Production of specification requirements for all laboratory furniture
Following a rigorous tender process including very detailed quality and H&S audits, Iab-Lab was appointed as principal contractor to undertake the complex redevelopment of the Olefins 6 laboratory at Sabic UK Petrochemical site in Redcar.
The fundamental requirement of the refurbishment was that the laboratory had to stay operational at all times during the works. Following discussions with Sabic an intricate phasing programme was agreed with the client. This involved removing existing and installing all new above ceiling services from above whilst the lab remained operational below. A service deck was installed above the ceiling to allow work to be completed safely. Once the above ceiling service work was completed the lab area was sectioned off into 3 phases to allow 1/3 of the lab to be refurbished at a time whilst the remaining 2/3 stayed operational. Screening was erected to separate the areas as required. On completion of each phase each section of the lab was handed back to the client and we moved through to the next area.
The refurbishment involved a full turn key development of the testing laboratory including all architectural work and M&E services including a full upgrade of all ventilation, air conditioning, extraction and special gas services.
Our work also involved the installation of bespoke designed pre-plumbed over head service gantries and specialized ATEX installations.
Laboratory design and installation is always a unique challenge but the additional challenges of working on a petrochemical site under strict REACH and Petroleum ( consolidation ) regulations 2014 made this an especially challenging project. We are extremely proud to have delivered this refurbishment to the highest of standards and to full client satisfaction.