Get to know our client

Spire Healthcare is one of the UK’s leading independent healthcare providers, operating a nationwide network of hospitals, clinics, and specialist medical facilities. Delivering a wide range of healthcare services, Spire is committed to providing high-quality patient care through advanced medical technologies, experienced healthcare professionals, and modern clinical environments.

iab-Lab has been proud to support Spire Healthcare across a number of their locations throughout the UK.

Main Scope of Works

  • Decommission existing HVAC systems within the offices and installation of new HVAC to suit new layout and laboratory requirements

  • Strip out of existing partitions and ceilings within offices and installation of new partitions as shown on contract drawings

  • Block up internal doorways as shown on contract drawings

  • Strip out of existing floor coverings within offices, installation of vinyl to new lab areas and all relevant amendments needed

  • Relocation of existing down draft benches and modifications to below ceiling extraction system as required

  • Modification of all M&E services where required

  • Installation and modification of new and existing laboratory furniture

  • Installation of new whiterock hygienic wall cladding within new lab areas, alterations to existing where required and all required decorations

  • Installation of external temporary portacabin complete with benching, down draft benches, M&E services, extraction and HVAC to allow lab operations to continue whilst dissection lab refurbishment takes place

iab-Lab successfully completed the initial fit of Spire Healthcare’s off-site Manchester Pathology Facility in 2018. Due to rapid growth and re-structuring of their pathology services, Spire contacted iab-Lab to complete a detailed design for the upgrade and expansion of the laboratories. Following approval of the design, we commenced construction work on site in October 2024.

The refurbishment was completed across 3 phases whilst maintaining the full function and operation of the laboratory throughout all works:

Phase 1 of the project involved the conversion of three existing manager offices and their integration into the adjacent laboratory space to create a larger, open-plan main laboratory. The works included upgrades to the existing ventilation systems to ensure full HTM compliance, alongside the installation of additional mechanical and electrical services to support the expanded laboratory environment. New laboratory benching was also installed, creating a functional and efficient workspace tailored to the client’s operational requirements.

Phase 2 involved the expansion of the block and slide laboratory area to create space for four analyser machines and an additional down draft bench.

Phase 3 involved the reconfiguration of the existing dissection lab to allow for the installation of additional down draft benches, ventilated storage and full layout adjustment. To avoid any disruption to Spire services as part of phase 3 works, a temporary portacabin laboratory was designed and set up in car park complete with extraction systems, associated ventilation, temperature control specialist 3 phase power, and water and drainage.

All planning, H&S, building control, landlord permissions and structural requirements were undertaken by iab-Lab for all phases of work as part of our comprehensive design and construction services offered.