SPIRE HEALTHCARE – PHARMACY – LIVERPOOL

SPIRE HEALTHCARE – P HARMACY – LIVERPOOL Completed March 2016 Contract Value £34,000 Liverpool Main Scope of Works Turnkey Refurbishment Cantilever Laboratory Furniture Mobile Units Medi Shelving System Custom Automatic Roller Shutter Spire Healthcare is a regular client to iab. As part of a successful partnership iab assisted the client with the design and construction of […]

INNOSPEC – HAIR CARE TESTING LABORATORY REFURBISHMENT

INNOSPEC – HAIR CARE TESTING LABORATORY REFURBISHMENT Completed December 2015 Contract Value £50,500 Ellesmere Port Main Scope of Works Complete Turnkey Laboratory Refurbishment Plinth Mounted Furniture Epoxy Resin Sinks Hand Shower Tepid Water Eye Wash Successfully completed for iab’s new client Innospec. The project was sent to us to tender approximately 12 months ago and […]

ROLLS-ROYCE CONTROLS AND DATA SERVICES –TEA POINTS

ROLLS-ROYCE CONTROLS AND DATA SERVICES –TEA POINTS Completed October 2015 Contract Value £114,000 Birmingham Main Scope of Works Parapan Doors Quartz stone worktops (Ceasarstone) Integrated fridges, freezers and dishwashers Stainless steel skirting Coloured glass splash backs As a registered sub contractor on BAM’s list of approved contractors, iab secured the project at Rolls-Royce Controls and […]

ROLLS-ROYCE CONTROLS AND DATA SERVICES – LABORATORY

ROLLS-ROYCE CONTROLS AND DATA SERVICES – LABORATORY Completed October 2015 Contract Value £76,000 Birmingham Main Scope of Works Laboratory furniture Ceramic Sinks ESD Worktops Table leg frames, powder coated Black Trespa Toplab worktops As a registered sub contractor on BAM’s list of approved contractors, iab secured the project at Rolls-Royce Controls and Data Services (Formally […]

SPIRE HEALTHCARE – CAMBRIDGE PATHOLOGY LABORATORY

SPIRE HEALTHCARE – CAMBRIDGE PATHOLOGY LABORATORY Completed April 2015 Contract Value £82,700 Cambridge Main Scope of Works Turnkey Mini Laboratory Refurbishment Cantilever Laboratory Furniture Mobile Units Mini HVAC Installation Double Downdraft Cut Up Bench   We have completed another refurbishment for our regular client Spire Healthcare. This time we converted a unused patients room and cleaners […]

BOC ANALYTICAL AND CHEMISTRY LABORATORY

BOC ANALYTICAL AND CHEMISTRY LABORATORY Completed May 2014 Contract Value £101,000 Yorkshire Main Scope of Works Service Gantries Maximum Bench Space Special Gas Services Mix of Plinth Mounted and Cantilevered Furniture Hot off the press. Another successful project for a new client that was completed on time and on budget. Working closely with the client […]

Willberforce College

WILBERFORCE COLLEGE Completed September 2013 Contract Value £325,000 Hull, East Riding, East Yorkshire Main Scope of Works Design and Build Full Strip out of existing facility Refurbishment of Existing Science Block Mechanical and Electrical Services Heating and Ventilation Bespoke Student Benches Plinth Mounted Furniture Fume Cupboards Trespa Athlon Work Surfaces Adjustable Height DDA compliant laboratory […]

ERMYSTED GRAMMAR SCHOOL – PHASE 3

ERMYSTEDS GRAMMAR SCHOOL – PHASE 3 Completed January 2013 Contract Value £46,000 Skipton, North Yorkshire Main Scope of Works Teaching Laboratory Traditional timber furniture with solid iroko work surfaces Forward facing student benches Elevated teachers bench with dais Preparation Room Fume cupboard and extract system Above floor mechanical services and Vulcathene Drainage Following the successful […]

SPIRE HEALTHCARE ELSTREE – PHASE 2

SPIRE HEALTHCARE ELSTREE – PHASE 2 Completed November 2012 Contract Value £146,000 Elstree, Hertfordshire Main Scope of Works Full Internal Fit-out Installation of all mechanical & electrical services Cantilever Furniture Mobile Units Reconfigured HVAC After a successful Phase 1 contract back in 2009 Spire returned to us to complete phase 2, which was a full […]

SGS WEST THURROCK

SGS WEST THURROCK Completed 2010 Contract Value £575,000 West Thurrock, Essex Main Scope of Works Full Internal Fit-out Cantilever Furniture Trespa & Iroko Worktops Fume Cupboards & Extraction Under a main contractor in West Thurrock iab completed the internal fit out of the laboratory furniture, fume cupboards & extraction, air replacement, AC and complex special gases including […]

© iab Lab 2022 | Registered in England: No. 2513825 | VAT Registered 606 976 705