ERMYSTED GRAMMAR SCHOOL – PHASE 3

ERMYSTEDS GRAMMAR SCHOOL – PHASE 3 Completed January 2013 Contract Value £46,000 Skipton, North Yorkshire Main Scope of Works Teaching Laboratory Traditional timber furniture with solid iroko work surfaces Forward facing student benches Elevated teachers bench with dais Preparation Room Fume cupboard and extract system Above floor mechanical services and Vulcathene Drainage Following the successful […]

ERMYSTED SCHOOL – PHASE 1 AND 2

ERMYSTED SCHOOL – PHASE 1 AND 2 Completed October 2003 Contract Value £205,000 Skipton, North Yorkshire Main Scope of Works Design & Specification Solid Timber Laboratory Furniture Solid Timber Iroko Work Surfaces Electrical and Ventilation Services Delivered in the Holiday Period Between Term Time. iab undertook the refurbishment of a series of existing physics and […]

© iab Lab 2022 | Registered in England: No. 2513825 | VAT Registered 606 976 705