Get to know our client

Wilberforce Sixth Form College is a well-established further education college located in Hull. Founded in 1988, it educates around 1,350 students aged 16-19. The college has a very strong track record of the students graduating to top universities in areas such as biology, chemistry and physics. With science being firmly embedded in its curriculum, Wilberforce requires well equipped and modern laboratory facilities to support the hands on learning they offer.

Main Scope of Works

  • Design and Build refurbishment of existing science block

  • Full strip out of existing facility, including furniture, joinery fixtures and mechanical and electrical installations

  • Installation of new mechanical and electrical services

  • Retention and modification of existing heating pipework and extract ventilation systems

  • Boarding and painting of all walls and ceilings, and installation and decoration of new architraves/windowsills and skirting

  • Installation of bespoke plinth-mounted laboratory furniture

  • Installation of new fume cupboards

  • Installation of Trespa Athlon laboratory work surfaces complete with cast epoxy resin sinks, laboratory-grade water taps, and gas taps

  • Installation of adjustable height DDA compliant laboratory benches

iab-Lab were appointed the contract for Willberforce College to deliver the refurbishment of an existing science block, creating modern teaching laboratories that meet current educational, technical, and accessibility requirements.

Following the complete strip-out of the existing laboratory furniture, joinery, and redundant mechanical and electrical services, iab-Lab designed, manufactured, and installed bespoke laboratory furniture tailored to the client’s teaching requirements. The new fit-out included plinth-mounted laboratory benching with integrated underbench storage, Trespa Athlon work surfaces, cast epoxy resin sinks, laboratory-grade water and gas taps, together with adjustable-height DDA-compliant laboratory benches to provide fully accessible teaching spaces.

Working in close coordination with the project team, iab-Lab integrated the new furniture layout with the installation of new mechanical and electrical services, while retaining and modifying the existing heating pipework and extract ventilation systems wherever possible. The refurbishment was completed with new wall and ceiling linings, decorations throughout, and the installation of new architectural joinery, delivering a modern, high-quality science facility with minimal disruption and maximum reuse of the existing building services.