Main Scope of Works

  • Refurbishment of existing premises to create new laboratories on the ground floor

  • Upgrade of the existing office and kitchenette areas on the first floor

  • New glazed partitions and doors

  • Modifications to existing water and drainage services to suit the layout

  • Alterations to existing electrical and lighting systems

  • New data cabling and outlets

  • Fixed laboratory furniture throughout the new laboratory areas

  • Full decoration and finishing works throughout all refurbished areas

  • New security systems including intruder alarm and CCTV system

  • Modifications to the existing fire alarm system

We were appointed to undertake the refurbishment of the client’s new premises, transforming the ground floor into new laboratory facilities while upgrading the existing office and kitchenette areas on the first floor.

The refurbishment included the installation of new glazed partitions and doors, together with modifications to the existing water, drainage and electrical services to accommodate the revised layouts. New data infrastructure was also installed throughout the relevant areas in accordance with the contract drawings.

The new laboratories were fitted with fixed laboratory furniture, providing practical and functional workspaces tailored to the client’s requirements. Finishing works included full decorations throughout the refurbished areas, new shelving within the electrical cupboard and boxing-in works within the toilet and lobby areas to provide a clean and consistent finish.

A new intruder alarm system alongside the new CCTV system was installed in accordance with the design drawings, completing the security and infrastructure requirements of the refurbished premises. Working closely with the client throughout the project, we delivered a fully integrated refurbishment tailored to their operational and technical requirements.